Military training facility, Oksbøl
Posted on 05-06-2023 by PPCD
Training facility for large military vehicles and tanks.
Heavily loaded large slabs/slabs-on-ground reinforced with DURUS® EasyFinish macro synthetic fiber reinforcement. No steel mesh needed.
All verifications were performed in PPCD’s online calculation software:
Beat your friends to it. See when the next program features are up and running, and be the first to optimize your concrete structures with steel and/or fiber reinforcement.